FY 27 Proposed Capital Budget
Lake Fanny Road Bridge #211
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered $0
New
Council District:
B
Location:
Bel Air
Project Schedule/Status: FY 29: Design FY 31: Right of Way/ Permits/ Utility FY 32: Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This project will replace the existing bridge on Lake Fanny over a tributary of Winters Run. The current structure is rated poor due to deterioration of the reinforced concrete slab bridge deck/superstructure. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future populations.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
Engineering/Design Land Acquisition
0 0 0 0 0 0
400,000
400,000
25,000 1,000,000 1,025,000
Construction
100,000
100,000
Inspection Fees
0 0
Equipment/Furnishing
Total Cost:
0
0
0 400,000
0
25,000 1,100,000 1,525,000
FUNDING SCHEDULE
R7000 Future Bonds
0
400,000
25,000 1,100,000 1,525,000
Total Cost:
0
0
0
0 400,000
0
25,000 1,100,000 1,525,000
ESTIMATED OPERATING BUDGET IMPACT:
FY 2027
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL