Harford County, MD FY 24 Proposed Capital Budget & Capital Improvement Program

Stormdrain Rehabilitation

HIGHWAYS - ROADS Project Number:

Operating Budget Impact

H064513 Multiple Various

Council District:

Revenues:

Location:

Expenditures: Cost Savings: None:

Est. Debt Service:

$4,200

(annual)

X

Expended/Encumbered as of 1/9/23: $2,190,292

Project Schedule/Status: Various projects are continuously being designed and constructed under this account.

PROJECT DESCRIPTION: Funds are to be used for replacement/rehabilitation/repair of existing stormdrain systems throughout the County. Additional funds are to be used for an inspection of the stormdrains. Due to the cost associated with inspecting all of the stormdrains in the County, the stormdrains most susceptible to deterioration will be inspected in the first phase of this analysis (i.e. corrugated metal pipes, greater than 48" in diameter and with a continuous base flow of water).

EXPENDITURE SCHEDULE

Cost Element

Prior

FY 2024 Approp Total

FY 2025 FY 2026 FY 2027 FY 2028 FY 2029

TOTAL

Engineering/Design Land Acquisition

320,000

15,000

335,000

10,000

10,000

10,000

10,000

10,000

385,000

0

0

Construction

1,746,231 310,000 2,056,231 225,000 225,000 225,000 225,000 225,000

3,181,231

Inspection Fees

175,000

25,000

200,000

15,000

15,000

15,000

15,000

15,000

275,000

Equipment/Furnishing

0

0

Total Cost:

2,241,231 350,000 2,591,231 250,000 250,000 250,000 250,000 250,000

3,841,231

FUNDING SCHEDULE

R8750 Paygo R7100 Prior Bonds R7000 Future Bonds

2,041,231

2,041,231 250,000 250,000 250,000 250,000 250,000

3,291,231

200,000

200,000 350,000

200,000 350,000

350,000

0 0

0 0

Total Cost:

2,241,231 350,000 2,591,231 250,000 250,000 250,000 250,000 250,000

3,841,231

335