FY 27 Proposed Capital Budget
Stafford Road Bridge #19
HIGHWAYS - BRIDGES Project Number:
Expended/Encumbered $0
New
Council District:
D
Location:
Darlington
Project Schedule/Status: FY 32: Design Outyears:Right of Way/ Permits/ Utility/ Construction
Expended/Enc.
Budget
PROJECT DESCRIPTION: This bridge carries Stafford Road over Herring Run. The bridge is under-designed and needs upgraded beams and abutments to carry legal loads. Additionally, the abutment is deteriorated and needs to be reconstructed. The project is eligible for Federal funding. This project is consistent with the Master Planning goal of maintaining a safe and adequate transportation system to serve existing and future opportunities.
EXPENDITURE SCHEDULE
Cost Element
Prior
FY 2027 Approp Total
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
Engineering/Design Land Acquisition
0 0 0 0 0 0
450,000
450,000
0 0 0 0
Construction
Inspection Fees
Equipment/Furnishing
Total Cost:
0
0
0
0
0
0 450,000
450,000
FUNDING SCHEDULE
R3140 Federal TAP R7000 Future Bonds
0 0
360,000 90,000
360,000 90,000
Total Cost:
0
0
0
0
0
0
0 450,000
450,000
ESTIMATED OPERATING BUDGET IMPACT:
FY 2027
FY 2028 FY 2029 FY 2030 FY 2031 FY 2032
TOTAL
299
Made with FlippingBook Ebook Creator